Nameplate capacity
227 MW
Rank in Florida
#50
of 346 plants
In service since
1973
April 1973
Details
- Primary fuel
- Other
- Technology
- Petroleum Liquids
- Operator
- Duke Energy Florida, LLC
- County
- Pinellas County
- Generating units
- 4
- Share of state capacity
- 0.28%
- Rank among other plants in Florida
- #3 of 41
- EIA plant code
- 627
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| P1 | Petroleum Liquids | 57 MW | 37 MW | 1973 | Operating |
| P2 | Petroleum Liquids | 57 MW | 19 MW | 1973 | Operating |
| P3 | Petroleum Liquids | 57 MW | 40 MW | 1973 | Operating |
| P4 | Petroleum Liquids | 57 MW | 41 MW | 1973 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Florida
| Santa Rosa Energy Center | Natural gas | 275 MW |
| S O Purdom | Natural gas | 270 MW |
| Suwannee River | Natural gas | 198 MW |
| Orange Cogeneration Facility | Natural gas | 157 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 227 MW solar plant and a 227 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates