Home / Power plants / Florida / S O Purdom

S O Purdom

Natural gas power plant · Wakulla County, Florida

Nameplate capacity
270 MW
Rank in Florida
#49
of 346 plants
In service since
2000
July 2000

Details

Primary fuel
Natural gas
Technology
Natural Gas Fired Combined Cycle
Operator
City of Tallahassee - (FL)
County
Wakulla County
Generating units
2
Share of state capacity
0.33%
Rank among natural gas plants in Florida
#41 of 65
EIA plant code
689

Generating units

Individual generating units at S O Purdom
UnitTechnologyNameplateSummerOnlineStatus
8Natural Gas Fired Combined Cycle180 MW150 MW2000Operating
9Natural Gas Fired Combined Cycle90 MW72 MW2000Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Florida

Tiger BayNatural gas278 MW
Santa Rosa Energy CenterNatural gas275 MW
BayboroOther227 MW
Suwannee RiverNatural gas198 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 270 MW solar plant and a 270 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates