Home / Power plants / Florida / Blackwater River Solar Energy Center

Blackwater River Solar Energy Center

Solar power plant · Santa Rosa County, Florida

Nameplate capacity
149 MW
Rank in Florida
#53
of 346 plants
In service since
2023
January 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Florida Power & Light Co
County
Santa Rosa County
Generating units
2
Share of state capacity
0.18%
Rank among solar plants in Florida
#1 of 225
EIA plant code
65433

Generating units

Individual generating units at Blackwater River Solar Energy Center
UnitTechnologyNameplateSummerOnlineStatus
1Solar Photovoltaic75 MW75 MW2023Operating
2Batteries75 MW75 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Florida

Suwannee RiverNatural gas198 MW
Orange Cogeneration FacilityNatural gas157 MW
CanoeSolar149 MW
FPL Chipola River Solar Energy CenterSolar149 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 149 MW solar plant and a 149 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates