Neil Simpson II

Coal power plant · Campbell County, Wyoming

Nameplate capacity
130 MW
Rank in Wyoming
#24
of 71 plants
In service since
1995
September 1995

Details

Primary fuel
Coal
Technology
Conventional Steam Coal
Operator
Black Hills Power, Inc.
County
Campbell County
Generating units
2
Share of state capacity
1.02%
Rank among coal plants in Wyoming
#5 of 10
EIA plant code
7504

Generating units

Individual generating units at Neil Simpson II
UnitTechnologyNameplateSummerOnlineStatus
2Conventional Steam Coal90 MW80 MW1995Operating
GT1Natural Gas Fired Combustion Turbine40 MW34 MW2000Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Wyoming

Foote Creek RimWind135 MW
Cedar Springs IIIWind133 MW
DunlapWind130 MW
Anticline WindWind124 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 130 MW solar plant and a 130 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Wyoming power plants · What Wyoming actually generates