Perry Solar Facility
Solar power plant · Taylor County, Florida
Nameplate capacity
5.1 MW
Rank in Florida
#303
of 346 plants
In service since
2016
August 2016
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Duke Energy Florida, LLC
- County
- Taylor County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Florida
- #193 of 225
- EIA plant code
- 60071
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| XXXXX | Solar Photovoltaic | 5.1 MW | 5.1 MW | 2016 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Florida
| Cape San Blas | Battery storage | 5.5 MW |
| Jennings Energy Storage Facility | Battery storage | 5.5 MW |
| RP-Orlando, LLC | Solar | 5.1 MW |
| Starratt Solar | Solar | 5.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.1 MW solar plant and a 5.1 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates