Home / Power plants / Florida / Perry Solar Facility

Perry Solar Facility

Solar power plant · Taylor County, Florida

Nameplate capacity
5.1 MW
Rank in Florida
#303
of 346 plants
In service since
2016
August 2016

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Duke Energy Florida, LLC
County
Taylor County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in Florida
#193 of 225
EIA plant code
60071

Generating units

Individual generating units at Perry Solar Facility
UnitTechnologyNameplateSummerOnlineStatus
XXXXXSolar Photovoltaic5.1 MW5.1 MW2016Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Florida

Cape San BlasBattery storage5.5 MW
Jennings Energy Storage FacilityBattery storage5.5 MW
RP-Orlando, LLCSolar5.1 MW
Starratt SolarSolar5.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.1 MW solar plant and a 5.1 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates