Jennings Energy Storage Facility

Battery storage power plant · Hamilton County, Florida

Nameplate capacity
5.5 MW
Rank in Florida
#302
of 346 plants
In service since
2022
August 2022

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Duke Energy Florida, LLC
County
Hamilton County
Generating units
1
Share of state capacity
0.01%
Rank among battery storage plants in Florida
#7 of 9
EIA plant code
63998

Generating units

Individual generating units at Jennings Energy Storage Facility
UnitTechnologyNameplateSummerOnlineStatus
ES1Batteries5.5 MW5.5 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Florida

LKL BLBD, LLCSolar6.0 MW
Cape San BlasBattery storage5.5 MW
Perry Solar FacilitySolar5.1 MW
RP-Orlando, LLCSolar5.1 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 5.5 MW solar plant and a 5.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.