ACE-Stanton A PV
Solar power plant · Orange County, Florida
Nameplate capacity
4.1 MW
Rank in Florida
#313
of 346 plants
In service since
2017
September 2017
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- ACE-Stanton A, LLC
- County
- Orange County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in Florida
- #199 of 225
- EIA plant code
- 61247
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| ASA1 | Solar Photovoltaic | 4.1 MW | 4.1 MW | 2017 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Florida
| Seminole Energy | Other | 4.8 MW |
| Springhill Gas Recovery Plant | Other | 4.8 MW |
| Cutrale Citrus Juices USA I | Natural gas | 4.1 MW |
| FL Solar D1, LLC | Solar | 4.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 4.1 MW solar plant and a 4.1 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates