Happy Jack Windpower Project
Wind power plant · Laramie County, Wyoming
Nameplate capacity
29 MW
Rank in Wyoming
#49
of 71 plants
In service since
2008
August 2008
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Duke Energy Renewables Services
- County
- Laramie County
- Generating units
- 1
- Share of state capacity
- 0.23%
- Rank among wind plants in Wyoming
- #27 of 28
- EIA plant code
- 56960
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| HJW01 | Onshore Wind Turbine | 29 MW | 29 MW | 2008 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Wyoming
| McFadden Ridge | Wind | 35 MW |
| General Chemical | Coal | 30 MW |
| Barber Creek | Natural gas | 23 MW |
| Hartzog | Natural gas | 23 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 29 MW solar plant and a 29 MW nuclear plant have the same entry here and produce very different amounts of electricity.