Cedar Springs I
Wind power plant · Converse County, Wyoming
Nameplate capacity
200 MW
Rank in Wyoming
#13
of 71 plants
In service since
2020
December 2020
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Cedar Springs Wind, LLC
- County
- Converse County
- Generating units
- 1
- Share of state capacity
- 1.57%
- Rank among wind plants in Wyoming
- #7 of 28
- EIA plant code
- 63914
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 82633 | Onshore Wind Turbine | 200 MW | 200 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Wyoming
| Ekola Flats | Wind | 251 MW |
| Roundhouse Wind Energy Project | Wind | 226 MW |
| Cedar Springs II | Wind | 200 MW |
| Top of the World Windpower Project | Wind | 200 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 200 MW solar plant and a 200 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Wyoming power plants · What Wyoming actually generates