Swire Coca-Cola Draper
Solar power plant · Salt Lake County, Utah
Nameplate capacity
3.7 MW
Rank in Utah
#91
of 133 plants
In service since
2026
January 2026
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- —
- County
- Salt Lake County
- Generating units
- 1
- Share of state capacity
- 0.03%
- Rank among solar plants in Utah
- #36 of 58
- EIA plant code
- 70112
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 11794 | Solar Photovoltaic | 3.7 MW | 3.7 MW | 2026 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Utah
| Spanish Fork Community Solar | Solar | 4.0 MW |
| Weber | Hydro | 3.8 MW |
| Spanish Fork | Hydro | 3.6 MW |
| SF Auto O1 | Solar | 3.4 MW |
About this data
From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.7 MW solar plant and a 3.7 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates