Nameplate capacity
3.6 MW
Rank in Utah
#90
of 131 plants
In service since
1937
October 1937
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- Strawberry Water Users Assn
- County
- Utah County
- Generating units
- 3
- Share of state capacity
- 0.03%
- Rank among hydro plants in Utah
- #12 of 29
- EIA plant code
- 3691
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 1.7 MW | 1.7 MW | 1983 | Operating |
| 2 | Conventional Hydroelectric | 1.7 MW | 1.7 MW | 1983 | Operating |
| 3 | Conventional Hydroelectric | 0.2 MW | 0.2 MW | 1937 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Utah
| Spanish Fork Community Solar | Solar | 4.0 MW |
| Weber | Hydro | 3.8 MW |
| SF Auto O1 | Solar | 3.4 MW |
| Blue Mountain Biogas | Other | 3.2 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.6 MW solar plant and a 3.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates