Home / Power plants / Utah / Red Mesa Solar Project

Red Mesa Solar Project

Solar power plant · San Juan County, Utah

Nameplate capacity
72 MW
Rank in Utah
#41
of 131 plants
In service since
2023
April 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
NTUA Generation - Utah, LLC
County
San Juan County
Generating units
1
Share of state capacity
0.63%
Rank among solar plants in Utah
#23 of 55
EIA plant code
66404

Generating units

Individual generating units at Red Mesa Solar Project
UnitTechnologyNameplateSummerOnlineStatus
PVSolar Photovoltaic72 MW72 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Utah

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 72 MW solar plant and a 72 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Utah power plants · What Utah actually generates