Horseshoe Solar, LLC
Solar power plant · Tooele County, Utah
Nameplate capacity
75 MW
Rank in Utah
#40
of 131 plants
In service since
2024
May 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Horseshoe Solar, LLC
- County
- Tooele County
- Generating units
- 1
- Share of state capacity
- 0.65%
- Rank among solar plants in Utah
- #22 of 55
- EIA plant code
- 63984
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| HSS | Solar Photovoltaic | 75 MW | 75 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Utah
| Three Peaks Power | Solar | 80 MW |
| Utah Red Hills Renewable Energy Park | Solar | 80 MW |
| Red Mesa Solar Project | Solar | 72 MW |
| Latigo Wind Park | Wind | 62 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 75 MW solar plant and a 75 MW nuclear plant have the same entry here and produce very different amounts of electricity.