Home / Power plants / South Carolina / Stamey Solar

Stamey Solar

Solar power plant · Darlington County, South Carolina

Nameplate capacity
2.0 MW
Rank in South Carolina
#186
of 214 plants
In service since
2023
December 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Headwater Energy, LLC
County
Darlington County
Generating units
1
Share of state capacity
0.01%
Rank among solar plants in South Carolina
#104 of 125
EIA plant code
62313

Generating units

Individual generating units at Stamey Solar
UnitTechnologyNameplateSummerOnlineStatus
77Solar Photovoltaic2.0 MW2.0 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in South Carolina

South SolarSolar2.0 MW
SpillwayHydro2.0 MW
Substation 20 PlantNatural gas2.0 MW
Tedder SolarSolar2.0 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.0 MW solar plant and a 2.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All South Carolina power plants · What South Carolina actually generates