Lily Solar

Solar power plant · Allendale County, South Carolina

Nameplate capacity
70 MW
Rank in South Carolina
#52
of 214 plants
In service since
2020
February 2020

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
X-Elio North America Inc
County
Allendale County
Generating units
1
Share of state capacity
0.26%
Rank among solar plants in South Carolina
#17 of 125
EIA plant code
63548

Generating units

Individual generating units at Lily Solar
UnitTechnologyNameplateSummerOnlineStatus
1Solar Photovoltaic70 MW70 MW2020Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in South Carolina

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 70 MW solar plant and a 70 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All South Carolina power plants · What South Carolina actually generates