Lily Solar
Solar power plant · Allendale County, South Carolina
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- X-Elio North America Inc
- County
- Allendale County
- Generating units
- 1
- Share of state capacity
- 0.26%
- Rank among solar plants in South Carolina
- #17 of 125
- EIA plant code
- 63548
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | 70 MW | 70 MW | 2020 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in South Carolina
| Midlands | Solar | 72 MW |
| Moffett Solar Project | Solar | 71 MW |
| Bushy Park Combustion Turbine Facility | Natural gas | 65 MW |
| Wylie | Hydro | 60 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 70 MW solar plant and a 70 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All South Carolina power plants · What South Carolina actually generates