Home / Power plants / South Carolina / Eastover Solar

Eastover Solar

Solar power plant · Richland County, South Carolina

Nameplate capacity
92 MW
Rank in South Carolina
#36
of 214 plants
In service since
2023
March 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Eastover Solar, LLC
County
Richland County
Generating units
2
Share of state capacity
0.34%
Rank among solar plants in South Carolina
#4 of 125
EIA plant code
66717

Generating units

Individual generating units at Eastover Solar
UnitTechnologyNameplateSummerOnlineStatus
ESTORSolar Photovoltaic74 MW74 MW2023Operating
STORBatteries18 MW18 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in South Carolina

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 92 MW solar plant and a 92 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All South Carolina power plants · What South Carolina actually generates