Chapman Solar
Solar power plant · Darlington County, South Carolina
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Headwater Energy, LLC
- County
- Darlington County
- Generating units
- 1
- Share of state capacity
- 0.01%
- Rank among solar plants in South Carolina
- #89 of 125
- EIA plant code
- 62186
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 28 | Solar Photovoltaic | 2.0 MW | 2.0 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in South Carolina
| Bryant Road Solar | Solar | 2.0 MW |
| Bull Street Plant | Natural gas | 2.0 MW |
| Gaines Solar | Solar | 2.0 MW |
| Gary Solar | Solar | 2.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.0 MW solar plant and a 2.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All South Carolina power plants · What South Carolina actually generates