Home / Power plants / North Carolina / Lincoln Combustion

Lincoln Combustion

Natural gas power plant · Lincoln County, North Carolina

Nameplate capacity
2,290 MW
Rank in North Carolina
#4
of 930 plants
In service since
1995
May 1995

Details

Primary fuel
Natural gas
Technology
Natural Gas Fired Combustion Turbine
Operator
Duke Energy Carolinas, LLC
County
Lincoln County
Generating units
17
Share of state capacity
5.71%
Rank among natural gas plants in North Carolina
#2 of 22
EIA plant code
7277

Generating units

Individual generating units at Lincoln Combustion
UnitTechnologyNameplateSummerOnlineStatus
17Natural Gas Fired Combustion Turbine536 MW365 MW2024Operating
1Natural Gas Fired Combustion Turbine110 MW73 MW1995Operating
10Natural Gas Fired Combustion Turbine110 MW73 MW1995Operating
11Natural Gas Fired Combustion Turbine110 MW73 MW1995Operating
12Natural Gas Fired Combustion Turbine110 MW73 MW1995Operating
13Natural Gas Fired Combustion Turbine110 MW72 MW1996Operating
14Natural Gas Fired Combustion Turbine110 MW72 MW1996Operating
15Natural Gas Fired Combustion Turbine110 MW73 MW1996Operating
16Natural Gas Fired Combustion Turbine110 MW73 MW1996Operating
2Natural Gas Fired Combustion Turbine110 MW74 MW1995Operating
3Natural Gas Fired Combustion Turbine110 MW73 MW1995Operating
4Natural Gas Fired Combustion Turbine110 MW73 MW1995Operating
5Natural Gas Fired Combustion Turbine110 MW72 MW1995Operating
6Natural Gas Fired Combustion Turbine110 MW72 MW1995Operating
7Natural Gas Fired Combustion Turbine110 MW72 MW1995Operating
8Natural Gas Fired Combustion Turbine110 MW72 MW1995Operating
9Natural Gas Fired Combustion Turbine110 MW71 MW1995Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in North Carolina

Belews CreekNatural gas2,491 MW
McGuireNuclear2,441 MW
Sherwood H Smith Jr Energy ComplexNatural gas2,245 MW
Marshall (NC)Natural gas2,119 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2,290 MW solar plant and a 2,290 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All North Carolina power plants · What North Carolina actually generates