Andover Energy Storage Project
Battery storage power plant · Sussex County, New Jersey
Details
- Primary fuel
- Battery storage
- Technology
- Batteries
- Operator
- VESI 25 LLC
- County
- Sussex County
- Generating units
- 1
- Share of state capacity
- 0.11%
- Rank among battery storage plants in New Jersey
- #1 of 10
- EIA plant code
- 65952
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| AD1 | Batteries | 20 MW | 20 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in New Jersey
| EDF Ph1 Toms River | Solar | 21 MW |
| Merck Rahway Power Plant | Natural gas | 21 MW |
| Ben Moreell Solar Farm | Solar | 20 MW |
| Justin Court Energy Storage | Battery storage | 20 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 20 MW solar plant and a 20 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New Jersey power plants · What New Jersey actually generates