Berlin Gorham
Battery storage power plant · Coos County, New Hampshire
Details
- Primary fuel
- Battery storage
- Technology
- Batteries
- Operator
- Great Lakes Hydro America LLC
- County
- Coos County
- Generating units
- 22
- Share of state capacity
- 0.97%
- Rank among battery storage plants in New Hampshire
- #1 of 1
- EIA plant code
- 54639
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| BESS1 | Batteries | 14 MW | 14 MW | 2023 | Operating |
| RS3 | Conventional Hydroelectric | 4.1 MW | 4.1 MW | 2020 | Operating |
| RS1 | Conventional Hydroelectric | 3.8 MW | 3.8 MW | 2020 | Operating |
| CAS3 | Conventional Hydroelectric | 3.1 MW | 3.1 MW | 2018 | Operating |
| CAS1 | Conventional Hydroelectric | 2.4 MW | 2.4 MW | 2014 | Operating |
| CAS2 | Conventional Hydroelectric | 2.4 MW | 2.4 MW | 2016 | Operating |
| SHL3 | Conventional Hydroelectric | 1.8 MW | 1.8 MW | 1929 | Operating |
| GOR1 | Conventional Hydroelectric | 1.2 MW | 1.2 MW | 2020 | Operating |
| GOR2 | Conventional Hydroelectric | 1.2 MW | 1.2 MW | 2020 | Operating |
| GOR3 | Conventional Hydroelectric | 1.2 MW | 1.2 MW | 2020 | Operating |
| GOR4 | Conventional Hydroelectric | 1.2 MW | 1.2 MW | 2020 | Operating |
| SH2 | Conventional Hydroelectric | 0.9 MW | 0.9 MW | 2016 | Operating |
| SHL1 | Conventional Hydroelectric | 0.9 MW | 0.9 MW | 2016 | Operating |
| SM1 | Conventional Hydroelectric | 0.8 MW | 0.8 MW | 1980 | Operating |
| SM2 | Conventional Hydroelectric | 0.8 MW | 0.8 MW | 1980 | Operating |
| SM4 | Conventional Hydroelectric | 0.8 MW | 0.8 MW | 1980 | Operating |
| SM3 | Conventional Hydroelectric | 0.7 MW | 0.8 MW | 1980 | Operating |
| XP5 | Conventional Hydroelectric | 0.7 MW | 0.7 MW | 2024 | Operating |
| XP1 | Conventional Hydroelectric | 0.6 MW | 0.6 MW | 2021 | Operating |
| XP2 | Conventional Hydroelectric | 0.6 MW | 0.6 MW | 2021 | Operating |
| XP3 | Conventional Hydroelectric | 0.6 MW | 0.6 MW | 2021 | Operating |
| XP4 | Conventional Hydroelectric | 0.5 MW | 0.5 MW | 2021 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in New Hampshire
| Burgess BioPower | Other | 75 MW |
| Groton Wind LLC | Wind | 48 MW |
| Antrim Wind | Wind | 29 MW |
| NE Renewable Tamworth, LLC | Other | 25 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 44 MW solar plant and a 44 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All New Hampshire power plants · What New Hampshire actually generates