Nameplate capacity
1,120 MW
Rank in Nevada
#3
of 117 plants
In service since
2004
May 2004
Details
- Primary fuel
- Natural gas
- Technology
- Natural Gas Fired Combined Cycle
- Operator
- Nevada Power Co
- County
- Clark County
- Generating units
- 5
- Share of state capacity
- 5.91%
- Rank among natural gas plants in Nevada
- #3 of 17
- EIA plant code
- 55841
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| ST1 | Natural Gas Fired Combined Cycle | 270 MW | 260 MW | 2004 | Operating |
| CT3 | Natural Gas Fired Combustion Turbine | 228 MW | 222 MW | 2024 | Operating |
| CT4 | Natural Gas Fired Combustion Turbine | 228 MW | 222 MW | 2024 | Operating |
| CT1 | Natural Gas Fired Combined Cycle | 197 MW | 180 MW | 2004 | Operating |
| CT2 | Natural Gas Fired Combined Cycle | 197 MW | 180 MW | 2004 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Nevada
| Chuck Lenzie Generating Station | Natural gas | 1,466 MW |
| Clark (NVE) | Natural gas | 1,376 MW |
| Gemini Solar Hybrid | Solar | 1,070 MW |
| Hoover Dam (NV) | Hydro | 1,039 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1,120 MW solar plant and a 1,120 MW nuclear plant have the same entry here and produce very different amounts of electricity.