Home / Power plants / Nevada / Gemini Solar Hybrid

Gemini Solar Hybrid

Solar power plant · Clark County, Nevada

Nameplate capacity
1,070 MW
Rank in Nevada
#4
of 117 plants
In service since
2024
March 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Gemini Solar
County
Clark County
Generating units
2
Share of state capacity
5.64%
Rank among solar plants in Nevada
#1 of 59
EIA plant code
63352

Generating units

Individual generating units at Gemini Solar Hybrid
UnitTechnologyNameplateSummerOnlineStatus
ARBE1Solar Photovoltaic690 MW690 MW2024Operating
ARPV1Batteries380 MW380 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Nevada

Clark (NVE)Natural gas1,376 MW
SilverhawkNatural gas1,120 MW
Hoover Dam (NV)Hydro1,039 MW
TracyNatural gas1,033 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1,070 MW solar plant and a 1,070 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates