Gemini Solar Hybrid
Solar power plant · Clark County, Nevada
Nameplate capacity
1,070 MW
Rank in Nevada
#4
of 117 plants
In service since
2024
March 2024
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Gemini Solar
- County
- Clark County
- Generating units
- 2
- Share of state capacity
- 5.64%
- Rank among solar plants in Nevada
- #1 of 59
- EIA plant code
- 63352
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| ARBE1 | Solar Photovoltaic | 690 MW | 690 MW | 2024 | Operating |
| ARPV1 | Batteries | 380 MW | 380 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Nevada
| Clark (NVE) | Natural gas | 1,376 MW |
| Silverhawk | Natural gas | 1,120 MW |
| Hoover Dam (NV) | Hydro | 1,039 MW |
| Tracy | Natural gas | 1,033 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1,070 MW solar plant and a 1,070 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Nevada power plants · What Nevada actually generates