Delta Wind Farm (MS)
Wind power plant · Coahoma County, Mississippi
Nameplate capacity
185 MW
Rank in Mississippi
#23
of 64 plants
In service since
2024
April 2024
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- AES Clean Energy
- County
- Coahoma County
- Generating units
- 1
- Share of state capacity
- 1.02%
- Rank among wind plants in Mississippi
- #1 of 1
- EIA plant code
- 66000
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| DLTA | Onshore Wind Turbine | 185 MW | 185 MW | 2024 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Mississippi
| Optimist | Solar | 250 MW |
| Golden Triangle II | Solar | 200 MW |
| Pearl River Solar Park LLC | Solar | 175 MW |
| Chevron Oil | Natural gas | 171 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 185 MW solar plant and a 185 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Mississippi power plants · What Mississippi actually generates