Upper Androscoggin
Hydro power plant · Androscoggin County, Maine · not currently in service
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- Lewiston City of
- County
- Androscoggin County
- Generating units
- 3
- Share of state capacity
- 0.03%
- Rank among hydro plants in Maine
- #40 of 48
- EIA plant code
- 54202
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 0.7 MW | 0.7 MW | 2020 | Out of service and NOT expected to return to service in next calendar year |
| 2 | Conventional Hydroelectric | 0.5 MW | 0.5 MW | 2020 | Out of service and NOT expected to return to service in next calendar year |
| 3 | Conventional Hydroelectric | 0.4 MW | 0.5 MW | 2020 | Out of service and NOT expected to return to service in next calendar year |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Maine
| Messalonskee 3 | Hydro | 1.6 MW |
| Oxford Solar, LLC | Solar | 1.6 MW |
| Barker Lower | Hydro | 1.5 MW |
| Madison BTM | Battery storage | 1.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.6 MW solar plant and a 1.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Maine power plants · What Maine actually generates