RE Gardiner Solar, LLC
Solar power plant · Kennebec County, Maine
Nameplate capacity
3.9 MW
Rank in Maine
#186
of 274 plants
In service since
2023
April 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- —
- County
- Kennebec County
- Generating units
- 1
- Share of state capacity
- 0.06%
- Rank among solar plants in Maine
- #109 of 175
- EIA plant code
- 70142
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| REGRD | Solar Photovoltaic | 3.9 MW | 3.9 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Maine
| Knights Pond Solar, LLC | Solar | 3.9 MW |
| Orono B | Hydro | 3.9 MW |
| Augusta Road Bowdoin Solar, LLC | Solar | 3.8 MW |
| Church Hill Road Augusta Solar, LLC | Solar | 3.8 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.9 MW solar plant and a 3.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Maine power plants · What Maine actually generates