Home / Power plants / Maine / Mars Hill Wind Farm Project

Mars Hill Wind Farm Project

Wind power plant · Aroostook County, Maine

Nameplate capacity
42 MW
Rank in Maine
#30
of 274 plants
In service since
2007
March 2007

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Evergreen Wind, LLC
County
Aroostook County
Generating units
1
Share of state capacity
0.68%
Rank among wind plants in Maine
#12 of 22
EIA plant code
56448

Generating units

Individual generating units at Mars Hill Wind Farm Project
UnitTechnologyNameplateSummerOnlineStatus
1Onshore Wind Turbine42 MW42 MW2007Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Maine

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 42 MW solar plant and a 42 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Maine power plants · What Maine actually generates