Nameplate capacity
19 MW
Rank in Maine
#51
of 274 plants
In service since
2026
January 2026
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- Brookfield White Pine Hydro LLC
- County
- Androscoggin County
- Generating units
- 3
- Share of state capacity
- 0.31%
- Rank among hydro plants in Maine
- #9 of 48
- EIA plant code
- 1491
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GI1 | Conventional Hydroelectric | 6.4 MW | 7.2 MW | 2026 | Operating |
| GI2 | Conventional Hydroelectric | 6.4 MW | 8.1 MW | 2026 | Operating |
| GI3 | Conventional Hydroelectric | 6.4 MW | 7.9 MW | 2026 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Maine
| Brunswick Hydro | Hydro | 20 MW |
| Worumbo Hydro Station | Hydro | 19 MW |
| Skelton | Hydro | 17 MW |
| Hydro Kennebec Project | Hydro | 15 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 19 MW solar plant and a 19 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Maine power plants · What Maine actually generates