Cenergy - Kiger
Solar power plant · Somerset County, Maine
Nameplate capacity
1.0 MW
Rank in Maine
#263
of 274 plants
In service since
2023
December 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Luminace Sunbeam Development Holdings, LLC
- County
- Somerset County
- Generating units
- 1
- Share of state capacity
- 0.02%
- Rank among solar plants in Maine
- #167 of 175
- EIA plant code
- 66877
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| KIG | Solar Photovoltaic | 1.0 MW | 1.0 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Maine
| Pittsfield Hydro | Hydro | 1.1 MW |
| Boundary Line Solar, LLC | Solar | 1.0 MW |
| Cenergy - Richards (CSG) | Solar | 1.0 MW |
| Gardiner | Hydro | 1.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.0 MW solar plant and a 1.0 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Maine power plants · What Maine actually generates