IMPA Washington Solar Park 2
Solar power plant · Daviess County, Indiana
Nameplate capacity
9.9 MW
Rank in Indiana
#102
of 224 plants
In service since
2023
July 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Indiana Municipal Power Agency
- County
- Daviess County
- Generating units
- 1
- Share of state capacity
- 0.03%
- Rank among solar plants in Indiana
- #32 of 123
- EIA plant code
- 66416
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| WASH2 | Solar Photovoltaic | 9.9 MW | 9.9 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Indiana
| IND Community Solar Farm 1st Phase | Solar | 10 MW |
| Indy Solar I, LLC | Solar | 10 MW |
| Crawfordsville 5 Solar Park | Solar | 9.8 MW |
| Caterpillar | Natural gas | 9.5 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 9.9 MW solar plant and a 9.9 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Indiana power plants · What Indiana actually generates