Heirloom Solar
Solar power plant · Pike County, Indiana
Nameplate capacity
60 MW
Rank in Indiana
#84
of 224 plants
In service since
2025
October 2025
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Heirloom Solar (Ratts 1 Phase 2 Solar, LLC)
- County
- Pike County
- Generating units
- 1
- Share of state capacity
- 0.17%
- Rank among solar plants in Indiana
- #22 of 123
- EIA plant code
- 67873
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| RAT2 | Solar Photovoltaic | 60 MW | 60 MW | 2025 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Indiana
| Primient | Natural gas | 62 MW |
| Portside Energy | Natural gas | 61 MW |
| Jasper County Solar Project | Solar | 60 MW |
| Troy Solar | Solar | 50 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 60 MW solar plant and a 60 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Indiana power plants · What Indiana actually generates