Meadow Creek Project Company
Wind power plant · Bonneville County, Idaho
Nameplate capacity
120 MW
Rank in Idaho
#16
of 155 plants
In service since
2012
December 2012
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Ridgeline Energy LLC
- County
- Bonneville County
- Generating units
- 1
- Share of state capacity
- 1.82%
- Rank among wind plants in Idaho
- #3 of 33
- EIA plant code
- 58106
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| MCPC | Onshore Wind Turbine | 120 MW | 116 MW | 2012 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Idaho
| Goshen Phase II | Wind | 125 MW |
| Jackpot Solar, LLC | Solar | 120 MW |
| Hemmingway BESS | Battery storage | 116 MW |
| Clearwater Paper IPP Lewiston | Other | 114 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 120 MW solar plant and a 120 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Idaho power plants · What Idaho actually generates