Jackpot Solar, LLC
Solar power plant · Twin Falls County, Idaho
Nameplate capacity
120 MW
Rank in Idaho
#15
of 155 plants
In service since
2022
December 2022
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Duke Energy Renewables Services
- County
- Twin Falls County
- Generating units
- 1
- Share of state capacity
- 1.83%
- Rank among solar plants in Idaho
- #3 of 14
- EIA plant code
- 65778
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| JKPT | Solar Photovoltaic | 120 MW | 120 MW | 2022 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Idaho
| Pleasant Valley Solar 2 Project | Solar | 125 MW |
| Goshen Phase II | Wind | 125 MW |
| Meadow Creek Project Company | Wind | 120 MW |
| Hemmingway BESS | Battery storage | 116 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 120 MW solar plant and a 120 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Idaho power plants · What Idaho actually generates