Home / Power plants / Idaho / Hemmingway BESS

Hemmingway BESS

Battery storage power plant · Owyhee County, Idaho

Nameplate capacity
166 MW
Rank in Idaho
#11
of 156 plants
In service since
2025
March 2025

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Idaho Power Co
County
Owyhee County
Generating units
3
Share of state capacity
2.45%
Rank among battery storage plants in Idaho
#1 of 10
EIA plant code
66325

Generating units

Individual generating units at Hemmingway BESS
UnitTechnologyNameplateSummerOnlineStatus
1Batteries80 MW80 MW2025Operating
3Batteries50 MW50 MW2026Operating
HGWP2Batteries36 MW36 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Idaho

Bennett MountainNatural gas173 MW
RathdrumNatural gas166 MW
Cedar Creek Wind, LLCWind160 MW
Boise Bench BESSBattery storage150 MW

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 166 MW solar plant and a 166 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Idaho power plants · What Idaho actually generates