Home / Power plants / Idaho / Boise Bench BESS

Boise Bench BESS

Battery storage power plant · Ada County, Idaho

Nameplate capacity
150 MW
Rank in Idaho
#13
of 156 plants
In service since
2026
June 2026

Details

Primary fuel
Battery storage
Technology
Batteries
Operator
Idaho Power Co
County
Ada County
Generating units
1
Share of state capacity
2.21%
Rank among battery storage plants in Idaho
#2 of 10
EIA plant code
68799

Generating units

Individual generating units at Boise Bench BESS
UnitTechnologyNameplateSummerOnlineStatus
BOBSBatteries150 MW150 MW2026Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Idaho

Hemmingway BESSBattery storage166 MW
Cedar Creek Wind, LLCWind160 MW
Kuna BESSBattery storage150 MW
Pleasant Valley Solar 2 ProjectSolar125 MW

About this data

From EIA’s inventory of operable generators, August 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 150 MW solar plant and a 150 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Idaho power plants · What Idaho actually generates