Home / Power plants / Florida / Turkey Point

Turkey Point

Nuclear power plant · Miami Dade County, Florida

Nameplate capacity
2,978 MW
Rank in Florida
#3
of 346 plants
In service since
1972
December 1972

Details

Primary fuel
Nuclear
Technology
Nuclear
Operator
Florida Power & Light Co
County
Miami Dade County
Generating units
7
Share of state capacity
3.67%
Rank among nuclear plants in Florida
#1 of 2
EIA plant code
621

Generating units

Individual generating units at Turkey Point
UnitTechnologyNameplateSummerOnlineStatus
3Nuclear877 MW837 MW1972Operating
4Nuclear877 MW844 MW1973Operating
5CANatural Gas Fired Combined Cycle472 MW466 MW2007Operating
5CTANatural Gas Fired Combined Cycle188 MW198 MW2007Operating
5CTBNatural Gas Fired Combined Cycle188 MW197 MW2007Operating
5CTCNatural Gas Fired Combined Cycle188 MW197 MW2007Operating
5CTDNatural Gas Fired Combined Cycle188 MW197 MW2007Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Florida

West County Energy CenterNatural gas4,263 MW
Crystal RiverCoal3,449 MW
ManateeNatural gas2,951 MW
Fort MyersNatural gas2,681 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2,978 MW solar plant and a 2,978 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates