Home / Power plants / Florida / Lakeland Electric Co. (FL) - Airport II

Lakeland Electric Co. (FL) - Airport II

Solar power plant · Polk County, Florida

Nameplate capacity
3.5 MW
Rank in Florida
#319
of 346 plants
In service since
2012
September 2012

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Sun E N7 Holdings LLC
County
Polk County
Generating units
1
Share of state capacity
0.00%
Rank among solar plants in Florida
#203 of 225
EIA plant code
59754

Generating units

Individual generating units at Lakeland Electric Co. (FL) - Airport II
UnitTechnologyNameplateSummerOnlineStatus
1Solar Photovoltaic3.5 MW3.5 MW2012Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Florida

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 3.5 MW solar plant and a 3.5 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates