Home / Power plants / Florida / Juniper Solar (FL)

Juniper Solar (FL)

Solar power plant · Pasco County, Florida

Nameplate capacity
70 MW
Rank in Florida
#234
of 346 plants
In service since
2023
December 2023

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Tampa Electric Co
County
Pasco County
Generating units
1
Share of state capacity
0.09%
Rank among solar plants in Florida
#164 of 225
EIA plant code
65683

Generating units

Individual generating units at Juniper Solar (FL)
UnitTechnologyNameplateSummerOnlineStatus
1Solar Photovoltaic70 MW70 MW2023Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Florida

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 70 MW solar plant and a 70 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates