JED Solid Waste Mgmt Renewable Energy
Other power plant · Osceola County, Florida
Nameplate capacity
9.6 MW
Rank in Florida
#288
of 346 plants
In service since
2017
March 2017
Details
- Primary fuel
- Other
- Technology
- Landfill Gas
- Operator
- LMS Energy USA LLC
- County
- Osceola County
- Generating units
- 6
- Share of state capacity
- 0.01%
- Rank among other plants in Florida
- #30 of 41
- EIA plant code
- 60701
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 00603 | Landfill Gas | 1.6 MW | 1.4 MW | 2017 | Operating |
| 00696 | Landfill Gas | 1.6 MW | 1.4 MW | 2017 | Operating |
| 00697 | Landfill Gas | 1.6 MW | 1.4 MW | 2017 | Operating |
| 00698 | Landfill Gas | 1.6 MW | 1.4 MW | 2017 | Operating |
| 00699 | Landfill Gas | 1.6 MW | 1.4 MW | 2017 | Operating |
| 00700 | Landfill Gas | 1.6 MW | 1.4 MW | 2017 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Florida
| Space Coast Next Gen Solar Energy | Solar | 10 MW |
| Wynwood Energy Storage | Battery storage | 10 MW |
| Trail Ridge Landfill Gas Recovery | Other | 9.6 MW |
| Baptist Medical Center | Natural gas | 9.0 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 9.6 MW solar plant and a 9.6 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates