Gulf Coast Solar Center II
Solar power plant · Santa Rosa County, Florida
Nameplate capacity
40 MW
Rank in Florida
#260
of 346 plants
In service since
2017
November 2017
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Arevon Energy, Inc.
- County
- Santa Rosa County
- Generating units
- 1
- Share of state capacity
- 0.05%
- Rank among solar plants in Florida
- #179 of 225
- EIA plant code
- 59690
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| GCSC2 | Solar Photovoltaic | 40 MW | 40 MW | 2017 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Florida
| Fernandina Plant | Other | 42 MW |
| Dover Solar and Battery Storage | Solar | 40 MW |
| Mosaic South Pierce Operations | Other | 38 MW |
| Bonnie Mine Solar | Solar | 38 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 40 MW solar plant and a 40 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates