Buttonwood

Solar power plant · St Lucie County, Florida

Nameplate capacity
75 MW
Rank in Florida
#123
of 346 plants
In service since
2024
November 2024

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Florida Power & Light Co
County
St Lucie County
Generating units
1
Share of state capacity
0.09%
Rank among solar plants in Florida
#54 of 225
EIA plant code
65920

Generating units

Individual generating units at Buttonwood
UnitTechnologyNameplateSummerOnlineStatus
1Solar Photovoltaic75 MW75 MW2024Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Florida

Bronson SolarSolar75 MW
Bullfrog Creek SolarSolar75 MW
CaloosahatcheeSolar75 MW
Cattle RanchSolar75 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 75 MW solar plant and a 75 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates