Nameplate capacity
60 MW
Rank in Florida
#240
of 346 plants
In service since
2023
December 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Tampa Electric Co
- County
- Polk County
- Generating units
- 1
- Share of state capacity
- 0.07%
- Rank among solar plants in Florida
- #168 of 225
- EIA plant code
- 61653
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 60 MW | 60 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Florida
| Laurel Oaks Solar | Solar | 61 MW |
| Grange Hall Solar | Solar | 61 MW |
| Durrance | Solar | 60 MW |
| Lee County Solid Waste Energy | Other | 59 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 60 MW solar plant and a 60 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Florida power plants · What Florida actually generates