Nameplate capacity
2.3 MW
Rank in Wisconsin
#214
of 278 plants
In service since
1984
June 1984
Details
- Primary fuel
- Hydro
- Technology
- Conventional Hydroelectric
- Operator
- Wisconsin Public Service Corp
- County
- Lincoln County
- Generating units
- 3
- Share of state capacity
- 0.01%
- Rank among hydro plants in Wisconsin
- #42 of 61
- EIA plant code
- 4068
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 3 | Conventional Hydroelectric | 1.5 MW | 1.5 MW | 1984 | Operating |
| 1 | Conventional Hydroelectric | 0.4 MW | 0.4 MW | 2017 | Operating |
| 2 | Conventional Hydroelectric | 0.4 MW | 0.4 MW | 2017 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Wisconsin
| Kohler Solar | Solar | 2.3 MW |
| Lannon Stone | Solar | 2.3 MW |
| UW Kegonsa Customer Hosted Solar | Solar | 2.3 MW |
| UW Parkside | Solar | 2.3 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 2.3 MW solar plant and a 2.3 MW nuclear plant have the same entry here and produce very different amounts of electricity.