Home / Power plants / Wisconsin / Cedar Ridge

Cedar Ridge

Wind power plant · Fond Du Lac County, Wisconsin

Nameplate capacity
68 MW
Rank in Wisconsin
#50
of 278 plants
In service since
2008
December 2008

Details

Primary fuel
Wind
Technology
Onshore Wind Turbine
Operator
Wisconsin Power & Light Co
County
Fond Du Lac County
Generating units
1
Share of state capacity
0.34%
Rank among wind plants in Wisconsin
#6 of 12
EIA plant code
56347

Generating units

Individual generating units at Cedar Ridge
UnitTechnologyNameplateSummerOnlineStatus
1Onshore Wind Turbine68 MW68 MW2008Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Wisconsin

Crawfish RiverSolar75 MW
Elk MoundNatural gas71 MW
Combined Locks Energy CenterNatural gas67 MW
Paddock SolarSolar65 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 68 MW solar plant and a 68 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Wisconsin power plants · What Wisconsin actually generates