Lund Hill Solar
Solar power plant · Klickitat County, Washington
Nameplate capacity
150 MW
Rank in Washington
#42
of 139 plants
In service since
2022
October 2022
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Avangrid Power LLC
- County
- Klickitat County
- Generating units
- 1
- Share of state capacity
- 0.47%
- Rank among solar plants in Washington
- #1 of 7
- EIA plant code
- 63509
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| LHS1 | Solar Photovoltaic | 150 MW | 150 MW | 2022 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Washington
| Hopkins Ridge Wind | Wind | 157 MW |
| Juniper Canyon I Wind Project | Wind | 151 MW |
| Rattlesnake Flat | Wind | 144 MW |
| HF Sinclair Puget Sound Refining | Natural gas | 140 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 150 MW solar plant and a 150 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Washington power plants · What Washington actually generates