Juniper Canyon I Wind Project
Wind power plant · Klickitat County, Washington
Nameplate capacity
151 MW
Rank in Washington
#41
of 139 plants
In service since
2011
March 2011
Details
- Primary fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- Avangrid Power LLC
- County
- Klickitat County
- Generating units
- 1
- Share of state capacity
- 0.48%
- Rank among wind plants in Washington
- #10 of 23
- EIA plant code
- 57320
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 151 MW | 149 MW | 2011 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Washington
| Mayfield | Hydro | 162 MW |
| Hopkins Ridge Wind | Wind | 157 MW |
| Lund Hill Solar | Solar | 150 MW |
| Rattlesnake Flat | Wind | 144 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 151 MW solar plant and a 151 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Washington power plants · What Washington actually generates