The Village at Orchard Ridge (TVOR)
Solar power plant · Frederick County, Virginia
Nameplate capacity
1.4 MW
Rank in Virginia
#253
of 261 plants
In service since
2023
March 2023
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Distributed Solar Development, LLC
- County
- Frederick County
- Generating units
- 1
- Share of state capacity
- 0.00%
- Rank among solar plants in Virginia
- #138 of 142
- EIA plant code
- 67272
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| P5412 | Solar Photovoltaic | 1.4 MW | 1.4 MW | 2023 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Virginia
| Molson Coors Shenandoah Brewery | Other | 1.4 MW |
| Newport Hydro Station | Hydro | 1.4 MW |
| Martinsville | Hydro | 1.3 MW |
| North Stafford HS | Solar | 1.3 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 1.4 MW solar plant and a 1.4 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Virginia power plants · What Virginia actually generates