Home / Power plants / Virginia / Sunnybrook Solar Project - Hybrid

Sunnybrook Solar Project - Hybrid

Solar power plant · Halifax County, Virginia

Nameplate capacity
51 MW
Rank in Virginia
#81
of 261 plants
In service since
2022
December 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Sunnybrook Farm Solar, LLC
County
Halifax County
Generating units
1
Share of state capacity
0.16%
Rank among solar plants in Virginia
#39 of 142
EIA plant code
65307

Generating units

Individual generating units at Sunnybrook Solar Project - Hybrid
UnitTechnologyNameplateSummerOnlineStatus
SUNSSolar Photovoltaic51 MW51 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Virginia

Scott Solar FarmBattery storage57 MW
ChesapeakeOther51 MW
Whitehorn SolarSolar50 MW
Bluestone SolarSolar50 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 51 MW solar plant and a 51 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Virginia power plants · What Virginia actually generates