Skipjack Solar Center

Solar power plant · Charles City County, Virginia

Nameplate capacity
175 MW
Rank in Virginia
#30
of 261 plants
In service since
2022
May 2022

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
AES Distributed Energy
County
Charles City County
Generating units
1
Share of state capacity
0.55%
Rank among solar plants in Virginia
#2 of 142
EIA plant code
62675

Generating units

Individual generating units at Skipjack Solar Center
UnitTechnologyNameplateSummerOnlineStatus
SKIPJSolar Photovoltaic175 MW175 MW2022Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Virginia

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 175 MW solar plant and a 175 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Virginia power plants · What Virginia actually generates