Home / Power plants / Virginia / Sebera Solar

Sebera Solar

Solar power plant · Prince George County, Virginia

Nameplate capacity
18 MW
Rank in Virginia
#134
of 261 plants
In service since
2025
March 2025

Details

Primary fuel
Solar
Technology
Solar Photovoltaic
Operator
Dominion Renewable Energy
County
Prince George County
Generating units
1
Share of state capacity
0.06%
Rank among solar plants in Virginia
#79 of 142
EIA plant code
65320

Generating units

Individual generating units at Sebera Solar
UnitTechnologyNameplateSummerOnlineStatus
SEBESolar Photovoltaic18 MW18 MW2025Operating

Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.

Similarly sized plants in Virginia

Quillwort SolarSolar18 MW
Radford Army Ammunition PlantNatural gas18 MW
Oceana SolarSolar18 MW
HollyfieldSolar17 MW

About this data

From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 18 MW solar plant and a 18 MW nuclear plant have the same entry here and produce very different amounts of electricity.

“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Virginia power plants · What Virginia actually generates