Sadler Solar
Solar power plant · Greensville County, Virginia
Nameplate capacity
100 MW
Rank in Virginia
#48
of 261 plants
In service since
2021
July 2021
Details
- Primary fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Dominion Energy Inc.
- County
- Greensville County
- Generating units
- 1
- Share of state capacity
- 0.32%
- Rank among solar plants in Virginia
- #15 of 142
- EIA plant code
- 62814
Generating units
| Unit | Technology | Nameplate | Summer | Online | Status |
|---|---|---|---|---|---|
| SADL | Solar Photovoltaic | 100 MW | 100 MW | 2021 | Operating |
Nameplate is the maximum rated output; summer capacity is what the unit can reliably deliver on a hot day, which is typically lower.
Similarly sized plants in Virginia
| Spruance Operating Services LLC | Natural gas | 115 MW |
| WestRock-West Point Mill | Other | 101 MW |
| Southampton Solar, LLC | Solar | 100 MW |
| Spring Grove I | Solar | 98 MW |
About this data
From EIA’s inventory of operable generators, May 2026 release. Capacity is nameplate — the maximum rated output of the equipment, not what the plant actually generates over a year, which depends on how often it runs. A 100 MW solar plant and a 100 MW nuclear plant have the same entry here and produce very different amounts of electricity.
“In service since” is the earliest in-service date among the units still listed, so a site rebuilt around newer equipment can read as younger than the site itself. All Virginia power plants · What Virginia actually generates